Online Documentation for SQL Manager for PostgreSQL
Specifying start and end points for the script
This step allows you to define the period. Generated script will consider changes made in this period.
Script start point
First select start point type: Tag or Date. Then either select tag from the drop-down list, or specify date. Last revision of branch can be selected as start point only when getting differential script.
Script end point
First select end point type: Last revision of branch (current database state), Tag or Date. Then either select tag from the drop-down list, or specify date.
Note: When the Step-by-step method of script generation is selected the Tag list will contain all tags/labels from current and parent branches. Tags/labels from parent branches appear in the list only if these branches heads are located in VCS tree structure higher than last revision the of branch.
Script end point
First select end point type: Last revision of branch (current database state), Tag or Date. Then either select tag from the drop-down list, or specify date.
Note: If the step-by-step mode is selected in the previous step, start point must be earlier then end point.
Click the Next button to proceed to the Specifying comments step of the wizard.